Table of Contents
Quality Management Guidelines (2022)
- Preface 17
- Introduction 39
- Quality Culture 1016
- Pre-Design Phase 1723
- Design Phase 2632
- 4.1 Introduction 2632
- 4.3 Owner Authorization and Approvals 2733
- 4.4 Funding 2834
- 4.5 Quality Management System (QMS) 2834
- 4.6 Initial Design Meeting 3137
- 4.7 Establishing Construction Duration and Scheduling 3238
- 4.8 Cost Estimates 3238
- 4.9 Sustainability/Resiliency, Certification, and Commissioning Requirements 3339
- 4.10 Changes in Design, Scope, or Criteria 3339
- 4.15 Nonconforming and Corrective Work 3844
- 4.16 Communications and Document Control 3945
- 4.17 Reports 3945
- 4.18 Permits and Approvals 4046
- 4.19 Design Support During Construction 4046
- 4.20 Construction Quality Management Specifications 4046
- 4.21 Construction Inspection and Testing Requirements 4147
- 4.22 Close-out and Warranty Management Planning 4147
- Procurement Phase 4551
- Construction Phase 5561
- 6.1 Introduction 5561
- 6.2 Contractor Quality Control/Quality Assurance (QC/QA) 5561
- 6.3 Pre-Construction Conference 5662
- 6.4 Construction Planning and Scheduling 5662
- 6.5 Inspection and Testing 5763
- 6.6 Reports and Recordkeeping 5965
- 6.7 Document Control and Distribution 5965
- 6.8 Changes in Work 6066
- 6.9 Nonconforming and Corrective Work 6066
- 6.10 Quality Audits 6167
- 6.11 Progress Meetings 6268
- 6.12 Progress Payments 6369
- 6.13 Final Reviews, Documentation, and Punchlist Work 6369
- 6.14 Special Operations Control 6470
- 6.15 Commissioning 6470
- 6.16 Disputes Avoidance and Resolution 6571
- 6.17 Documentation 6571
- 6.18 Beneficial Occupancy 6571
- 6.19 Substantial Completion 6672
- 6.20 Final Acceptance 6672
- Post-Construction Phase 7076
- Appendix 7581
- Glossary 8187
- Index 8389