Table of Contents
Technology Management Guidelines (2023)
- Preface 16
- Introduction 38
- Data 1217
- Building Information Modeling 2530
- Pre-design Phase 3338
- Design Phase 4045
- Procurement Phase 4752
- Construction Phase 5257
- 7.1 Introduction 5257
- 7.2 Pre-Construction Conference(s) 5257
- 7.3 Existing Conditions 5358
- 7.4 Construction Planning and Scheduling 5358
- 7.5 Communication Procedures 5459
- 7.6 Recordkeeping and Reporting 5459
- 7.7 Document Control and Distribution 5560
- 7.8 Permits, Insurance, Labor Affidavits, and Bonds 5661
- 7.9 Quality 5661
- 7.10 Commissioning 5762
- 7.11 Progress Meetings 5762
- 7.12 Progress Payments 5863
- 7.13 Record Drawings 5863
- 7.14 Pre-Closeout Meeting 5863
- 7.15 Punchlists 5964
- Post-Construction Phase 6267
- Glossary 6772
- Index 7277