Table of Contents
Cost Management Guidelines (2025)
- Acknowledgments 17
- Preface 28
- Introduction 511
- Cost Management System 1218
- Pre-Design Phase 2632
- Estimating 4046
- Procurement 5258
- Cost Compliance Monitoring 6167
- 6.1 Cost Management Plan Objectives 6167
- 6.2 Managing Project Contingency 6167
- 6.3 Using Contingency to Manage Risk 6268
- 6.4 Contingency Management for Guaranteed Maximum Price Contracts 6571
- 6.5 Fast-Track Project Contingency 6571
- 6.6 Developing and Implementing a Cost Monitoring and Compliance System 6672
- 6.7 Specifying Cost Monitoring Methods 6773
- Design Phase 7177
- Construction Phase 8187
- 8.1 Specifying Cost Monitoring and Management Procedures 8187
- 8.2 Schedule of Values 8288
- 8.3 Prompt Payment Requests Evaluation 8490
- Specifying, Developing, and Implementing an Integrated Cost-Loaded Schedule 8490
- 8.5 Change Order Control System 8591
- 8.6 Factors Governing Cost Changes During Construction 8793
- 8.7 Cost Evaluation System for Potential Claims 8995
- 8.8 Productivity Studies, Impact Analyses, and Labor Loss of Efficiency 9096
- Post-Construction/Project Closeout Phase 95101
- Glossary of Terms 100106
- Index 114120
- Additional References 118124